Guide

Bathroom renovation in Ottawa: what to expect, step by step

From the first site visit to the final walkthrough. Written by the team that renovates bathrooms across Ottawa, Orléans, Carleton Place and Arnprior.

1. Decide the scope

A refresh keeps the layout and replaces the finishes. A full gut takes the room down to the subfloor and rebuilds it. Moving a toilet, shower or vanity, or adding a bathroom in the basement, changes the plumbing and the price, so decide this first.

2. Free site visit

We measure, take photos and look at what is behind the walls where we can: existing plumbing, the floor, the exhaust fan and any sign of past leaks. We also ask what you want: a glass shower, a freestanding tub, a double vanity, heated floors.

3. A detailed, fixed-price proposal

You receive a written Scope of Work and a priced Bill of Quantities. Your proposal includes material allowances, so you choose the tile, vanity and fixtures. The price only changes if you approve a written change.

4. The build, in order

  1. Demolition and removal
  2. Plumbing and electrical changes, and the exhaust fan
  3. Waterproofing of the shower or tub surround before any tile goes on
  4. Floor and wall tile
  5. Vanity, mirror, lighting and glass shower door
  6. Paint, trim and final clean

A typical bathroom takes 2 to 4 weeks of site work, depending on size and the amount of tile.

5. Walkthrough and warranty

We walk the finished bathroom with you, fix anything on the list, and the work is backed by a two-year workmanship warranty.

What affects the price

Size, whether the layout moves, the tile and fixtures you choose, a glass shower or freestanding tub, and the condition of the floor and walls once the old bathroom is out. We do not quote by phone, because two bathrooms of the same size can be very different jobs. After the site visit you get one fixed price.

See our work

Browse our before-and-after projects and read our bathroom renovations page. Customers rate us 5.0 stars from 36 Google reviews on our reviews page.

Questions homeowners ask

How long does a bathroom renovation take?

A typical bathroom takes 2 to 4 weeks of site work, depending on size and tile work.

Do you waterproof the shower?

Yes. Every shower and tub surround is waterproofed before tile goes on.

Can I choose my own fixtures and tile?

Yes. Your proposal includes material allowances, and you pick the finishes.

Can you add a bathroom in the basement?

Yes. We build basement bathrooms with waterproofed showers, and we coordinate any permit the work needs.

Is the price fixed?

Yes. You get a detailed Bill of Quantities with a fixed price. Anything you add later is a written change order you approve first.

Get your free quote

Get your free quote

We reply within one business day. Prefer to talk? Call (613) 413-1756.

CallWhatsAppFree quote