Guide

Kitchen renovation in Ottawa: what to expect, step by step

From the first site visit to the final walkthrough. Written by the team that renovates kitchens across Ottawa, Orléans, Carleton Place and Arnprior.

1. Decide the scope

Keep the layout and replace cabinets, counters and finishes, or change the layout and move plumbing and electrical? A new layout costs more and takes longer, so decide this first.

2. Free site visit

We measure, take photos and talk through how you cook and live in the kitchen. We check the plumbing, the electrical, the venting and the floor. We also ask whether you want custom cabinets or an IKEA kitchen.

3. A detailed, fixed-price proposal

You receive a written Scope of Work and a priced Bill of Quantities covering cabinets, countertops, backsplash, lighting, flooring and the trades. The price only changes if you approve a written change.

4. The build, in order

  1. Demolition and removal
  2. Plumbing, electrical and lighting changes
  3. Flooring and cabinet installation
  4. Countertop template and installation
  5. Tile backsplash
  6. Appliance and plumbing hook-ups, paint and final clean

Most kitchens take 3 to 6 weeks of site work, depending on cabinet delivery and countertops. We plan the work in stages and agree a temporary kitchen setup with you before we start.

5. Walkthrough and warranty

We walk the finished kitchen with you, fix anything on the list, and the work is backed by a two-year workmanship warranty.

What affects the price

Size, whether the layout changes, the cabinets and countertops you choose, the appliances, lighting and flooring, and what we find behind the old walls. We do not quote by phone, because two kitchens of the same size can be very different jobs. After the site visit you get one fixed price.

See our work

Browse our before-and-after projects and read our kitchen renovations page. Customers rate us 5.0 stars from 36 Google reviews on our reviews page.

Questions homeowners ask

How long does a kitchen renovation take?

Usually 3 to 6 weeks of site work, depending on cabinet delivery and countertops.

Do you install IKEA kitchens?

Yes. We assemble and install IKEA kitchens, including countertops, plumbing and electrical.

Will I have a kitchen during the work?

We plan the work in stages and agree a temporary setup with you before we start.

Is the price fixed?

Yes. You get a detailed Bill of Quantities with a fixed price. Anything you add later is a written change order you approve first.

Get your free quote

Get your free quote

We reply within one business day. Prefer to talk? Call (613) 413-1756.

CallWhatsAppFree quote